D105 Sany Concrete Pump Parts Small End Bearing Block Assembly
Contact Person : JiLiu
Phone Number : 0086-18975137227
WhatsApp : +8618975137227
Minimum Order Quantity : | 1piece | Price : | 80$ |
---|---|---|---|
Packaging Details : | Export standards | Delivery Time : | 5days |
Payment Terms : | L/C, T/T | Supply Ability : | 20pcs/month |
Place of Origin: | Chang sha China | Brand Name: | OEM |
---|---|---|---|
Model Number: | Connection between transfer case housing and 055 arm pump |
Detail Information |
|||
Adapted Models: | Pump Truck | Factory Code: | A820405000086 |
---|---|---|---|
Weight: | 2kg | ||
High Light: | Concrete Pump 3Axis End Cover,Pump Transfer Case 3Axis End Cover |
Product Description
Sany And Zoomlion Concrete PumpTransfer Case Three-Axis End Cover Connection Between Transfer Case Housing And 055 Arm P
The installation of the PTO (Power Take-Off) split gearbox oil pump flange in a concrete pump truck involves the following steps:
Positioning: The flange is positioned on the designated mounting area of the PTO split gearbox. It is essential to align the bolt holes on the flange with those on the gearbox to ensure a proper fit.
Mounting Bolts: The flange is secured to the PTO split gearbox using mounting bolts. These bolts are inserted through the bolt holes on the flange and threaded into the corresponding holes on the gearbox. It is important to tighten the bolts evenly and securely to ensure a stable and leak-free connection.
Gasket Placement: A gasket, typically made of a material such as rubber or fiber, is placed between the flange and the gearbox. The gasket helps create a seal and prevents oil leakage at the connection point. The gasket is positioned in such a way that it lines up with the bolt holes on both the flange and the gearbox.
Tightening Bolts: Once the gasket is in place, the mounting bolts are tightened further. It is crucial to follow the specified torque requirements provided by the manufacturer to achieve the proper tightness. This ensures a secure and reliable connection between the flange and the PTO split gearbox.
Inspection: After the flange is installed and the bolts are tightened, a visual inspection is performed to ensure that the flange is properly aligned and there are no signs of misalignment, damage, or leakage. Any issues should be addressed and resolved before operating the concrete pump truck.
It is important to note that the specific installation process may vary depending on the concrete pump truck model and manufacturer's instructions. It is recommended to consult the equipment's manual or seek professional guidance during the installation procedure to ensure proper installation and operation of the PTO split gearbox oil pump flange.
Enter Your Message