D105 Sany Concrete Pump Parts Small End Bearing Block Assembly
Contact Person : JiLiu
Phone Number : 0086-18975137227
WhatsApp : +8618975137227
Minimum Order Quantity : | 1piece | Price : | 80$ |
---|---|---|---|
Packaging Details : | Export standards | Delivery Time : | 7days |
Payment Terms : | L/C, T/T | Supply Ability : | 10pcs/month |
Place of Origin: | Chang sha China | Brand Name: | Vice factory |
---|---|---|---|
Model Number: | Multi functional inflation tool set |
Detail Information |
|||
Colour: | Black |
---|
Product Description
The spare part nitrogen charging tool for the accumulator in a concrete pump truck is a specialized tool used to charge the accumulator with nitrogen gas. Here is a description of the function and role of the spare part nitrogen charging tool for the accumulator in a concrete pump truck:
The spare part nitrogen charging tool for the accumulator in a concrete pump truck is an essential tool that facilitates the process of charging the accumulator with nitrogen gas. Nitrogen gas is commonly used in hydraulic accumulators due to its non-reactive properties and ability to maintain stable pressure levels.
The primary function of the nitrogen charging tool is to provide a controlled and regulated flow of nitrogen gas into the accumulator. It typically consists of a pressure gauge, a valve, and a connection mechanism that allows for safe and efficient charging of the accumulator.
When the accumulator requires recharging or adjustment of the nitrogen gas pressure, the nitrogen charging tool is connected to the nitrogen gas supply source. The tool allows the operator to monitor and control the pressure level as the nitrogen gas is introduced into the accumulator.
The nitrogen charging tool is designed to ensure the proper filling of nitrogen gas without over-pressurizing the accumulator. It enables the operator to adjust and maintain the desired pressure within the specified range, which is crucial for the optimal performance and safety of the hydraulic system.
Proper training and knowledge of the manufacturer's guidelines are essential when using the nitrogen charging tool. It is important to follow the recommended procedures and safety precautions to prevent accidents or damage to the accumulator or other components of the hydraulic system.
Regular inspection and maintenance of the nitrogen charging tool are necessary to ensure its accuracy and reliability. This includes checking for any signs of wear, damage, or leakage and replacing any faulty components to maintain the tool's functionality.
Enter Your Message