Type 175A Concrete Pump Pipeline Alloy Steel Casting Screw Pipe Clamp
Contact Person : JiLiu
Phone Number : 0086-18975137227
WhatsApp : +8618975137227
Minimum Order Quantity : | 1 | Price : | $95 |
---|---|---|---|
Packaging Details : | Export standard packing 550*148*148mm | Delivery Time : | 8 work days |
Payment Terms : | D/P, T/T | Supply Ability : | 1000 Pieces/month |
Place of Origin: | Changsha, Hunan, China | Brand Name: | Changsha Tongchuang Mechanical |
---|---|---|---|
Model Number: | 125*R275-90°+225mm |
Detail Information |
|||
Name: | Pump Truck Double-layer Lengthened Elbow | Product Name: | Concrete Pump Elbow |
---|---|---|---|
Applicable Model: | Pump Truck, Distributor, Concrete Pump | Specifications And Models: | 125*R275-90°+225mm |
Specification Size: | 580*148*148mm | Quality Assurance(m³): | 80000 |
Material: | Inner Tube High Chromium Cast Iron | Hardness: | ≥HRC64 |
High Light: | Concrete Pump Pipeline Double Wall Elbow,Concrete Pump Pipeline 90 Degree Elbow,Concrete Double Wall 90 Degree Elbow |
Product Description
Concrete Pump Pipeline Double-layer lengthened elbow 125*R275-90°+225mm
Concrete Pump Pipeline Double-layer lengthened elbow 125*R275-90°+225mm | |
Name | Pump truck double-layer lengthened elbow |
Product name | Concrete Pump Elbow |
Place of origin | Changsha, Hunan, China |
Brand name | Changsha Tongchuang Mechanical |
Applicable model | Pump truck, distributor, concrete pump |
Specifications and models | 125*R275-90°+225mm |
Specification size | 580*148*148mm |
Weight | 24KG |
Hardness | ≥HRC64 |
Quality assurance(m³) | 80000 |
Material | Inner tube high chromium cast iron |
Supply capacity | 1000 Pieces/month |
Packing | Export standard packing 580*148*148mm |
Minimum order | 2 |
Price | $95 |
Product features and advantages:
1,Strong wear resistance, safety and explosion-proof
2,Automatic welding, stable quality
3,Patented formula, special technology
Maintenance method:
1,After the operation is finished, please clean the pipeline in time.
2,During assembly, align the pipe mouth accurately, and the pipe clamp is fixed firmly, which can prolong the service life of the flange.
3,When pumping about 30,000 cubic meters of concrete, please turn the elbow around for use.
Enter Your Message