Zoomlion XCMG Schwing Concrete Pump Spare Parts Boom Balance Valve
Contact Person : JiLiu
Phone Number : 0086-18975137227
WhatsApp : +8618975137227
Minimum Order Quantity : | 1 | Price : | $200-220 |
---|---|---|---|
Packaging Details : | Export standard packing 504*185*141mm | Delivery Time : | 7 work days |
Payment Terms : | D/P, T/T | Supply Ability : | 300 Pieces/month |
Place of Origin: | Changsha, Hunan, China | Brand Name: | Changsha Tongchuang Mechanical |
---|---|---|---|
Model Number: | 100C2118D.6.3A |
Detail Information |
|||
Name: | S Valve Hydro Cylinder/swing Valve Hydro Cylinder | Applicable Model: | Applicable To All Models Of Sany Concrete Pump/pump Truck /truck-mounted Pump |
---|---|---|---|
Specification Size: | 504*185*141mm | Specifications And Models: | 100C2118D.6.3A |
Chromium Coating: | ≥20 | Material: | Steel |
High Light: | Concrete Pump Spare Parts Hydro Cylinder,S Valve Concrete Pump Spare Parts,Swing Valve Hydro Cylinder |
Product Description
Sany Concrete pump parts S valve hydro cylinder/swing valve hydro cylinder
Sany Concrete pump parts S valve hydro cylinder/swing valve hydro cylinder | |
Name | S valve hydro cylinder/swing valve hydro cylinder |
Place of origin | Changsha, Hunan, China |
Brand name | Changsha Tongchuang Mechanical |
Applicable model | Applicable to all models of Sany concrete pump/pump truck /truck-mounted pump |
Specifications and models | 100C2118D.6.3A |
Specification size | 504*185*141mm |
Weight | 40KG |
chromium coating | ≥20 |
Quality assurance | 12 months |
Material | Steel |
Supply capacity | 300 Pieces/month |
Packing | Export standard packing 504*185*141mm |
Minimum order | 1 |
Price | $200-220 |
Product features and advantages:
1,Compact structure, high hardness of chromium plating layer on piston rod.
2,Good wear resistance
3,Adopt imported SKF seal, with better sealing performance and long service life.
4,Wear-resistant copper sleeve
Maintenance method:
1,Regularly check whether the piston rod leaks hydraulic oil.
2,Make sure that the surface of the piston rod is clean and free of foreign matters during each concrete pumping process, so as to prevent the piston rod from being pulled.
3,When oil leaks, it is necessary to replace the seal package of the swing cylinder in time; when the piston rod is pulled, it is necessary to replace the swing cylinder assembly.
Enter Your Message