| Brand Name: | Changsha Tongchuang Mechanical |
| Model Number: | 150A90R280 |
| MOQ: | 1 |
| Price: | $125 |
| Delivery Time: | 7 work days |
| Payment Terms: | D/P, T/T |
Putzmeister Concrete Pump Parts no.2 elbow
| Putzmeister Concrete Pump Parts no.2 elbow | |
| Name | No.2 elbow |
| Place of origin | Changsha, Hunan, China |
| Brand name | Changsha Tongchuang Mechanical |
| Applicable model | Applicable to all models of Putzmeister concrete pump truck /truck-mounted pump |
| Specifications and models | 150A90R280 |
| Specification size | 400*240*210mm |
| Weight | 29KG |
| Quality assurance | 6 months |
| Material | Steel |
| Supply capacity | 500 Pieces/month |
| Packing | Export standard packing 400*240*210mm |
| Minimum order | 1 |
| Price | $125 |
Product features and advantages:
1,high wear resistance, high stability, uniform pipe diameter, high installation accuracy and high cost performance.
2,inner pipe hardness reaches HRC 63.
3,pumping volume is 60,000 cubic meters.
Maintenance method:
Avoid heavy objects hitting.
![]()
| Brand Name: | Changsha Tongchuang Mechanical |
| Model Number: | 150A90R280 |
| MOQ: | 1 |
| Price: | $125 |
| Packaging Details: | Export standard packing 400*240*210mm |
| Payment Terms: | D/P, T/T |
Putzmeister Concrete Pump Parts no.2 elbow
| Putzmeister Concrete Pump Parts no.2 elbow | |
| Name | No.2 elbow |
| Place of origin | Changsha, Hunan, China |
| Brand name | Changsha Tongchuang Mechanical |
| Applicable model | Applicable to all models of Putzmeister concrete pump truck /truck-mounted pump |
| Specifications and models | 150A90R280 |
| Specification size | 400*240*210mm |
| Weight | 29KG |
| Quality assurance | 6 months |
| Material | Steel |
| Supply capacity | 500 Pieces/month |
| Packing | Export standard packing 400*240*210mm |
| Minimum order | 1 |
| Price | $125 |
Product features and advantages:
1,high wear resistance, high stability, uniform pipe diameter, high installation accuracy and high cost performance.
2,inner pipe hardness reaches HRC 63.
3,pumping volume is 60,000 cubic meters.
Maintenance method:
Avoid heavy objects hitting.
![]()