
170mm Putzmeister Concrete Pump Parts S Valve Swing Valve Cylinder
Contact Person : JiLiu
Phone Number : 0086-18975137227
WhatsApp : +8618975137227
Minimum Order Quantity : | 1 | Price : | $140-200 |
---|---|---|---|
Packaging Details : | Export standard packing 265*265*260mm | Delivery Time : | 7 work days |
Payment Terms : | D/P, T/T | Supply Ability : | 1000 Pieces/month |
Place of Origin: | Changsha, Hunan, China | Brand Name: | Changsha Tongchuang Mechanical |
---|---|---|---|
Model Number: | DN200/DN230/DN250 |
Detail Information |
|||
Name: | Concrete Piston | Applicable Model: | Applicable To All Models Of Putzmeister Concrete Pump Truck |
---|---|---|---|
Specifications And Models: | DN200/DN230/DN250 | Specification Size: | 265*265*260mm |
Quality Assurance(m³): | 20000 | Material: | Polyurethane&rubber |
Hardness: | 95A | Tensile Strength Of Support: | ≥39Mpa |
High Light: | Putzmeister Concrete Pump Parts Piston,Rubber Putzmeister Concrete Pump Parts Piston,Putzmeister concrete pump piston |
Product Description
Putzmeister Concrete Pump Parts Concrete Piston DN200/DN230/DN250
Putzmeister Concrete Pump Parts Concrete Piston DN200/DN230/DN250 | |
Name | Concrete Piston |
Place of origin | Changsha, Hunan, China |
Brand name | Changsha Tongchuang Mechanical |
Applicable model | Applicable to all models of Putzmeister concrete pump truck |
Specifications and models | DN200/DN230/DN250 |
Specification size | 265*265*260mm |
Weight | 10KG |
Hardness | 95A |
Tensile strength of support | ≥39Mpa |
Quality assurance(m³) | 20000 |
Material | Polyurethane&rubber |
Supply capacity | 1000 Pieces/month |
Packing | Export standard packing 265*265*260mm |
Minimum order | 1 |
Price | $140-200 |
Product features and advantages:
1,Importing polyurethane raw materials and adding appropriate additives can effectively improve the wear resistance and heat resistance of products.
2,Excellent comprehensive physical properties, small friction coefficient, good self-lubricating performance, and the average life of the product can reach 350 hours.
Maintenance method:
1,Accurate alignment and firm fixation during assembly.
2,If it is found that the water quality of the cooling water tank becomes turbid or mortar enters the water tank, it is necessary to replace the concrete piston immediately, otherwise the conveying cylinder will be strained and worn at an early stage.
3,Ensure the lubrication of concrete piston in place.
Enter Your Message