Send Message
Contact Us

Contact Person : JiLiu

Phone Number : 0086-18975137227

WhatsApp : +8618975137227

Free call

Zoomlion Concrete Pump Key GB1191-2000 8 * 16 For 8 * 16 Half Shaft 1040500218

Minimum Order Quantity : 1piece Price : 1$
Packaging Details : Export standards Delivery Time : 3days
Payment Terms : L/C, T/T Supply Ability : 200pcs/month
Place of Origin: Chang sha China Brand Name: OEM
Model Number: GB119.1-2000 8*16

Detail Information

Adapted Models: Pump Truck Factory Code: 1040500218
Weight: 0.006kg
High Light:

Zoomlion Concrete Pump Key

,

Zoomlion Concrete Pump Half Shaft

,

Zoomlion Concrete Pump Parts 1040500218

Product Description

The locating pin on the mixing half-shaft of a Zoomlion concrete pump truck serves specific functions and plays a crucial role in the mixing process. Here is a description of its functionality:

  1. Shaft Alignment: The primary function of the locating pin is to ensure proper alignment of the mixing half-shaft. It serves as a guide that positions the mixing half-shaft accurately within the mixer assembly. This alignment is crucial for maintaining the integrity and effectiveness of the mixing process.

  2. Prevents Shaft Rotation: The locating pin helps prevent rotational movement of the mixing half-shaft. It acts as a fixed point that keeps the shaft in place, preventing it from rotating or shifting during the mixing operation. This stability ensures that the mixing half-shaft remains securely positioned, allowing for consistent and reliable mixing performance.

  3. Load Distribution: The locating pin assists in distributing the load and forces exerted on the mixing half-shaft. By providing a fixed reference point, it helps evenly distribute the applied forces across the shaft and associated components. This load distribution minimizes the risk of localized stress concentrations, reducing wear and ensuring the longevity of the mixing system.

  4. Easy Assembly and Disassembly: The locating pin facilitates the easy assembly and disassembly of the mixing half-shaft. It serves as a guide that aids in aligning and inserting the shaft into the appropriate position within the mixer assembly. During disassembly, the locating pin allows for quick and efficient removal of the mixing half-shaft for maintenance or replacement purposes.

  5. Enhanced Safety: The locating pin enhances the safety of the mixing process by ensuring that the mixing half-shaft remains securely positioned. It prevents the shaft from becoming dislodged or misaligned, reducing the risk of equipment malfunctions or accidents during operation. The presence of the locating pin contributes to a safer working environment for operators and maintenance personnel.

Zoomlion Concrete Pump Key GB1191-2000 8 * 16 For 8 * 16 Half Shaft 1040500218 0Zoomlion Concrete Pump Key GB1191-2000 8 * 16 For 8 * 16 Half Shaft 1040500218 1Zoomlion Concrete Pump Key GB1191-2000 8 * 16 For 8 * 16 Half Shaft 1040500218 2

 

You Might Be Into These
Get in touch with us

Enter Your Message

45609475@qq.com
+8618975137227
008618975137227
0086-18975137227