Send Message
Contact Us

Contact Person : JiLiu

Phone Number : 0086-18975137227

WhatsApp : +8618975137227

Free call

Zoomlion Concrete Pump Spare Parts Double Alloy Cutting Ring DN200 DN230 DN260

Minimum Order Quantity : 1 Price : $140-180
Packaging Details : Export standard packing 320*320*50mm Delivery Time : 7 work days
Payment Terms : D/P, T/T Supply Ability : 800 Pieces/month
Place of Origin: Changsha, Hunan, China Brand Name: Changsha Tongchuang Mechanical
Model Number: DN200/DN230/DN260

Detail Information

Name: Double Alloy Cutting Ring Applicable Model: Applicable To All Models Of Zoomlion Concrete Pump Trucks
Specifications And Models: ¢200/¢230/¢260 Specification Size: 320*320*50mm
Weight: 9.8KG Useful Life(m³): 15000
Plate Ring Material: Double Alloy (surface Width 20, Inner Hole Is Wear-resistant Welding) Wire Hardness: 57-65
Alloy Hardness: 84-86 Alloy Strength: 2200-2500
High Light:

Double Alloy Concrete Pump Spare Parts

,

Concrete Pump Spare Parts Ring

,

Double Alloy Cutting Ring

Product Description

Zoomlion Concrete Pump Parts Double alloy cutting ring DN200/DN230/DN260

 

 

Zoomlion Concrete Pump Parts Double alloy cutting ring DN200/DN230/DN260
Name Double alloy cutting ring
Place of origin Changsha, Hunan, China
Brand name Changsha Tongchuang Mechanical
Applicable model Applicable to all models of Zoomlion concrete pump trucks
Specifications and models DN200/DN230/DN260
Specification size 320*320*50mm
Weight 9.8KG
Useful life(m³) 15000
Plate ring material Double alloy (surface width 20, inner hole is wear-resistant welding)
Wire hardness 57-65
Alloy hardness 84-86
Alloy strength 2200-2500
Supply capacity 800 Pieces/month
Packing Export standard packing 320*320*50mm
Minimum order 1
Price $140-180

 

 

Product features and advantages:
1, High wear resistance, stable quality, high wear resistance and average service life ≥ 15,000m³.
2, Adopting double alloy structure, the alloy's brazing fullness reaches 100%, which effectively reduces welding stress and completely eliminates alloy chipping.
3, The Original factory design ensures the installation quality and pumping seal, which is conducive to prolonging the service life of hopper, transition sleeve, S pipe and other related parts.

 

 

Maintenance method:

1, Regularly check the gap between the glasses plate and the cutting ring. Once the gap is found to increase, please tighten the special-shaped nut or replace the wearing parts immediately to prevent the mortar from entering the friction surface
2, Rotate the cutting ring regularly to make it wear evenly, generally use it for about 100 hours and rotate the cutting ring 90︒

 

 

 

Zoomlion Concrete Pump Spare Parts Double Alloy Cutting Ring DN200 DN230 DN260 0

You Might Be Into These
Get in touch with us

Enter Your Message

45609475@qq.com
+8618975137227
008618975137227
0086-18975137227